Transmission Project Bundle


 

Project Description

The Project Bundle involved installing a new transmission line conductor and fiber optic shield wire, reinforcing existing towers, the installation of new towers, removing and replacing two existing 500kV SF6 circuit breakers and five motor-operated disconnect switches, and removing and replacing the bus and insulators with the installation of the new higher rated equipment.  The interconnection included installation of a new 230kV SF6 circuit breaker, motor operated disconnect switch, and a gas insulated bus.

Lafata-Contract-Services-Conastone Breaker Bushing Removal.jpg
 
 

Project Highlights

  • The team’s successes included increasing the capacity for two-230 transmission circuits, increasing the substation capacity for the 500kV circuit, and installing the substation interconnection for the new 230kV circuit.

  • LCS had been awarded this project after the client was dissatisfied with an existing contractor’s performance, increasing the challenge of the role as it is difficult to turn around a troubled project.

  • LCS’ knowledge of the client’s PM processes and our proven experience has ensured the project success after a slow start. The project is now on schedule.

 
 

 

OTHER ELECTRIC TRANSMISSION PROJECTS

TakeThree Studio

Creative Duo & Design Studio✌🏼


💡We help brands tell their stories
⚡️Branding, Strategy & Websites
🚀1:1 Mentorship & Creative Consulting

https://www.takethreestudio.com
Previous
Previous

Long Term Infrastructure Improvement Plan (LTIIP)

Next
Next

Manufacturing Plant Main Extension